Swan Active Midland
After a $30 million revamp, Swan Active Midland re-opened on Saturday, May 11, 2024. Swan Active Midland closed for a full refurbishment in July 2021. The public are now enjoying a gym that’s four times bigger than the old one, upgraded indoor pools and sports courts, and enhanced facilities throughout. The project took longer than expected to complete but it was worth the wait.
Civil and General Distributors worked with Dorrington Plumbing to supply our high quality aesthetically pleasing Ultimate Stainless 50mm deep channel and heel guard non-slip stainless steel grates for the pool and surrounding areas. To cater for the different requirements, we supplied over 146 metres of 233mm wide drains for the pool areas and over 22 metres of 133mm wide drains for the spa area.