Stage 1 of the $42million Mandurah Aquatic and Recreation Centre (MARC) redevelopment officially opened on 27 September 2015 revealing:
- A new 50m outdoor pool,
- A new leisure pool and change room village,
- Refurbishment of the existing 25m lap pool,
- A new clubroom facility, and
- An indoor aqua, pirate-themed playground.
Long runs of Stormtech stainless steel electropolished grates and PVC channels with MEA pits and galvanised grates and SPS stainless steel floor wastes and paving grates in outdoor areas were supplied to the surrounds of the new pool areas by Civil and General Distributors.