Chevron’s new headquarters built at One The Esplanade at Elizabeth Quay comprises 29 floors of office space.
The Brookfield Properties development adds 57,000sqm of premium-grade office space to the city, transforming Elizabeth Quay from a residential and recreational hub into a key part of the city’s office space.
Civil and General Distributors worked with Sanwell Pty Ltd to provide drainage to the ground floor public podium areas.
Click here to take a look at a video showing the cleverly concealed top slot drain under the public area seating.
Three slip resistant heavy duty Ultimate Stainless grate and frames.
Over 105 metres of MEA Top Slot grates with S1000 120mm deep channels including 17 inspection boxes.
Using Ultimate Stainless again there is 21 metres of curved top slot grates hidden under the seating together with 3 tile insert inspection boxes.
Throughout the public area there are 12 Ultimate Stainless paver insert sump grates medium and large sized.
At the carpark entrance there is 7 metres of MEA LZ2000/130 200 mm wide shallow depth channels with ductile iron heel guard grates.